BIM in Latvian public tenders

The BIM part of a tender bid isn’t hard, but it is long, and one empty section can cost points or the whole bid. We prepare it for you, provide the BIM specialist for your key personnel, or train your team.

Experience with the BIM requirements of VNĪ, VAMOIC, Nodrošinājuma valsts aģentūra, Rīgas Satiksme and Rail Baltica

MK 529

When BIM is mandatory

Since 2025, a building information model has been part of the design for new publicly funded third-group buildings in Latvia, under Cabinet Regulation No. 529 “Ēku būvnoteikumi” (points 74.¹ and 236).

Since 2023, design contracts and design-and-build contracts can’t be awarded on price alone (Public Procurement Law, section 51), so clients also score quality, such as key personnel experience and the use of BIM. Clients ask for BIM on reconstructions and restorations too, where the law doesn’t require it.

Checked in October 2026. Regulation text on likumi.lv

Who
Clients that are public-law legal persons: state institutions, municipalities and other public bodies. EU-funded buildings count when such a body co-finances them.
Which buildings
New third-group buildings, for example public buildings over 1,000 m², or buildings with more than six storeys above ground or more than one below.
What to submit
A building information model for the architecture, structural and engineering systems parts, uploaded with the design to the Construction Information System (BIS) in an open format such as IFC.
From when
Construction intentions filed from 1 January 2025.
The bid

What clients ask for in the bid

Requirements differ from tender to tender. The Cabinet’s explanatory note points clients to VNĪ’s BIM requirements as a model, and a bid usually includes:

Pre-contract BIM execution plan

How BIM will run on the contract: roles, deliverables, levels of detail and the schedule, on the client’s template and with a responsibility matrix.

Sample models

Discipline models in native format and IFC, combined into a federated model. They show the team can meet the requirements, and are often scored.

BIM competence questionnaire

The company’s experience, software and processes. In some tenders it is a qualification requirement.

BIM specialist in key personnel

A BIM manager or coordinator with experience on similar projects, shown by a CV and references.

Risks

Where bids lose points

In a 2026 VNĪ tender the BIM part was worth 5 points out of 100. When prices are close, those points decide the winner. Some mistakes cost more than points: under VNĪ’s evaluation criteria a bid is excluded if

  • the pre-contract BIM execution plan or the responsibility matrix is missing;
  • a section is empty or doesn’t follow the client’s template;
  • the matrix leaves out required deliverables;
  • a model is shown at a lower level of detail (LOD) than required.

A sample model that doesn’t meet the requirements scores 0, and the client may reject the bid.

Services

We prepare it, join your team, or train you

We prepare the BIM part

We read the tender rules and prepare everything they ask for: the pre-contract BEP, the responsibility matrix, the competence questionnaire and the sample models. Before submission we check every document against the evaluation criteria and the models with IFC Checker.

A BIM specialist in your team

Our lead BIM specialist, Madars Siksna, can be key personnel in your bid and run BIM on the project after the award. Experience: Rail Baltica Riga Central Station and main line, and client-side BIM management for VNĪ on Riga Castle and the New Riga Theatre.

We train your team

A workshop for your bid team: reading BIM requirements, filling in the BEP and the matrix, and checking models before submission. With templates to reuse in your next tenders.

After the award we carry on with BIM management and coordination on the contract.

See BIM management and coordination

How it works

01

Reading the tender rules

Send us the tender documents. We list everything the BIM part needs, and the evaluation criteria where points can be lost.

02

Preparing the BIM part

The pre-contract BEP and responsibility matrix, sample models to the client’s requirements, the competence questionnaire and a BIM specialist for key personnel.

03

Checking before submission

We check every document against the evaluation criteria and the sample models with IFC Checker, so no section is left empty.

Experience

Experience behind our BIM management

Our lead BIM specialist, Madars Siksna, managed and coordinated BIM on these projects while working for other companies. Tenders can count this experience for key personnel.

11 years in construction, from modelling for fabrication and structural design to BIM management and coordination on Rail Baltica. 2022–2023: BIM Project Manager at VAS “Valsts nekustamie īpašumi” (State Real Estate), with BIM requirements (EIR, BEP) for the state property portfolio and client-side BIM management on the New Riga Theatre and Riga Castle.

Experience with these clients’ BIM requirements on real projects

  • Valsts nekustamie īpašumi (VNĪ)
  • VAMOIC
  • Nodrošinājuma valsts aģentūra
  • Rīgas Satiksme
  • Rail Baltica
Madars SiksnaLead BIM specialist
  • Rail Baltica main line construction, Latvia

    Lead BIM coordinator · 2025–2026 · Employer: ERB Rail

    Lead BIM coordination for the main contractor’s joint venture building the Rail Baltica main line in Latvia.

    Project page
    15,000+ m²
  • Riga Central Station design, Rail Baltica

    BIM coordinator · 2020–2024 · Employer: JV BERERIX

    BIM coordination of the station’s design for every construction stage, for the general contractor.

    Project page
    15,000+ m²
  • New Riga Theatre restoration, Riga

    BIM manager · 2022–2023 · Employer: VNĪ (State Real Estate)

    Client-side BIM management for the restoration of the theatre’s historic buildings and the new building beside them, delivered design-and-build.

    Project page
    5,000–15,000 m²
  • Riga Castle restoration, Riga

    BIM manager · 2022–2023 · Employer: VNĪ (State Real Estate)

    Client-side BIM management for the restoration and reconstruction of the castle convent for museum use.

    Project page
    5,000–15,000 m²
  • Mežaparks Great Stage construction, Riga

    BIM engineer · 2020–2021 · Employer: RERE Design&Build

    Construction-stage BIM engineering for the contractor on the new open-air stage for the Song and Dance Festival.

    Project page
    5,000–15,000 m²

Frequently asked questions

Preparing a bid with BIM requirements?

Send us the tender documents or a link to them in EIS. We reply within one working day.