BIM management and coordination for construction projects
From company-level IT strategy to clash-free federated models. We set up how information is created, exchanged and checked, then run it on your project.
IT strategy
How your company creates, stores and exchanges project information. We map your current tools and workflows, write the organisational information requirements and plan the rollout.
What you get
- Review of current software, licences and workflows
- Organisational and asset information requirements (OIR, AIR)
- CDE structure, naming and access rules
- Rollout plan with training and [timeline]
Standards, formats and tools
BIM management
We set the rules every party delivers to and check that they do: information requirements, execution plans and model reviews at each project stage.
What you get
- Exchange information requirements (EIR)
- BIM execution plan (BEP) and responsibility matrix
- IDS rules for model checks
- Model reviews at every information exchange
Standards, formats and tools
BIM coordination
Federated models, clash tests and issue tracking across disciplines, so problems are solved in the model, not on site.
What you get
- Federated model per coordination cycle
- Clash tests by discipline pair
- BCF issues tracked to closure
- Coordination meeting reports
Standards, formats and tools
Selected projects
Projects where our people delivered .projects services, sorted by size.
Riga Central Station, Rail Baltica
Railway & transport · Riga · Client: JV BERERIXRailway track, platform, embankment and drainage models from LOD 300 to LOD 500 through design and construction, and a Dynamo script that generates the 3D track in Revit from Civil 3D data.
Railway embankment, Riga Central Station
Railway & transport · Riga · Client: JV BERERIXEmbankment model for Riga Central Station, with model and data checks.
Hydropower plant fish pass
Energy & utilities · Riga · Client: Latvian Environment, Geology and Meteorology Centre3D model of a hydropower plant’s fish pass, built from a point cloud for reconstruction works.
Riga Castle
Heritage · Riga · Client: LNK IndustriesAs-built heating, ventilation and air-conditioning (HVAC) model of Riga Castle.
Frequently asked questions
As early as possible, ideally before design contracts are signed. Information requirements set at the start cost less to meet than changes made later.
Both. We can represent the client and set the requirements, or work for the design team or contractor and deliver to them.
Mainly Navisworks and Solibri, with issues exchanged as BCF. We adapt to the tools your project already uses.
Yes. On Riga Central Station we modelled track, platforms, embankment and drainage from LOD 300 to LOD 500 to Rail Baltica’s requirements, and built Dynamo scripts that fill 18 of the 25 mandatory Rail Baltica parameters in Revit and Civil 3D.
Discuss your project
Tell us what you are working on. We reply within one working day.